Project Information
Clients:
Battersea Power Station Development Company
Contract Value:
1.2 million
Duration:
2 years
Project Location:
Battersea
Scope

Battersea Power Station Phase 3B

JAG were employed on Battersea phase 3B to carry out the drainage and rainwater installation, which comprised of SVP’s picking up a residential POD bathroom block and a commercial block with toilet cores and future use points for office fit out.

The site comprised of 2 levels of basement with drainage and rainwater distribution throughout connecting to existing outfalls in B2. The SVP’s and  RWP’s rise from basement at various points rising up through 15 floors and terminating at roof level.