Project Information
Waterside Places
2.2 Million
1.5 Years
London Borough of Haringe
256 Apartments across 8 blocks
Flexible commercial spaces offered in the ground floor, which are shell and core only, with the majority of residential units situated above in 8 blocks referenced as Block C,D,E & F, H, I, J & K.
With associated parking for the units and landscaping to the southern end of the site. It also comprises its associated Public Realm and infrastructure (including district heating and substation), construction of pedestrian footbridge to the East of the Site
M&E shell and core only, Mechanical works included of District heating, boosted mains cold water risers, plant room. Final connections left in the utility cupboard connected to HIU. Electrical works included Landlords supplies, Life safety distribution including ATS, Primary and secondary containment, All LV panels, ryefield boards, distribution boards. Lighting and lighting control systems
